HYDROPOWER PLANTS ĐERDAP

2022 Upgrade of Iron Gate 2 Navigation Lock Đerdap 2
2020 Production and installation of cooling system of HPP ĐERDAP 1 Đerdap 1
2020 Fabrication and installation of pipe system of turbine regulation of HPP ĐERDAP 1 Đerdap 1
2019 Capital overhaul BPZ A2 at HE ĐERDAP 2 Đerdap 2
2018 Capital overhaul BPZ A7 and radial gate overhaul at HE ĐERDAP 2 Đerdap 2
2017 Works on production and delivery of cooling system for the aggregate phase V of revitalization Đerdap 2
2016 Fabrication and installation of piping systems for the aggregate Phase V of turbine regulation revitalization Đerdap 2
2014 Manufacture & installation of turbine regulation pipeline A-5 Đerdap 2
2014 Manufacture & delivery of pipeline of cooling system A-5 Đerdap 2
2013 Capital overhaul BPZ A8 and HMO electric and overflow dam HPP Đerdap 2 Đerdap 2
2012 Capital overhaul of HMO channel locks A-6 HE ĐERDAP 2 Đerdap 2
2011 Capital overhaul of BPZ A9 Đerdap 2
2010 Capital overhaul of BPZ A4 Đerdap 2