2021 | Capital overhaul and rehabilitation TENT B Obrenovac | Obrenovac |
2020 | Delivery and installation of construction for FDG plant-TENT B Obrenovac | Obrenovac |
2020 | Installation of water mixture pipelines at the ash dump | Obrenovac |
2020 | Delivery and installation of construction for FDG plant-TENT A Obrenovac | Obrenovac |
2019 | Current and overhaul maintenance on coal supply 1 & 2 | Obrenovac |
2019 | Mills overhaul A1-A6 TENT-A | Obrenovac |
2019 | Current maintenance of excavator station and ESP | Obrenovac |
2019 | Overhaul of airmixture system four verticals per unit | Obrenovac |
2019 | Repair of coal bunker | Obrenovac |
2019 | Installation of sealin mechanism for duct of Unit | Obrenovac |
2019 | Slag handling machine overhaul | Svilajnac |
2019 | Overhaul of conveyor at coal supply | Svilajnac |
2018 | Replacement of part of duct with sealing of Unit A-3 | Obrenovac |
2018 | Moving, lifting and transport of cargo heavier than 10 ton | Obrenovac |
2018 | Overhaul maintenance on coal supply 1& 2 | Obrenovac |
2018 | Current slag handling system maintenance | Obrenovac |
2018 | Air mixture canal overhaul TENT | Obrenovac |
2018 | Replacement of part of recirculation channels with comp.& supporting rings A4 | Obrenovac |
2018 | Mills overhaul A1-A6 | Obrenovac |
2017 | Overhaul of mills A4 & A5 | Obrenovac |
2016 | Spreader erection in Kolubara | Kolubara |
2016 | Reconstruction of part of recirculation channels o ESP in TPP Morava | Svilajnac |
2016 | Dismounting & erection of elements EF for TPP Morava | Svilajnac |
2016 | Production and supply of elements EF for TPP Morava | Svilajnac |
2015 | Boiler supporting steel structure (both superstructures) of Unit A2 at TENT Obrenovac | Obrenovac |
2015 | Replacement of CAM & coal burner in Unit A2 | Obrenovac |
2014 | Production & supply of steel structure for spreader in Kolubara | Kolubara |
2014 | Coal furnaces | Obrenovac |
2012 | Dismounting - erection works on air mixture ducts in TENT-A | Obrenovac |
2012 | DGS mill overhaul at TENT Unit A3 | Obrenovac |
2012 | Regular & emergency maintenance of new ash handling system at TENT B | Obrenovac |
2012 | TENT B Combustion screen overhaul | Obrenovac |
2011 | Additional works on ESP at TENT B2 | Obrenovac |
2011 | Dismounting-erection works on 3 DGS on mill at TENT Unit A4 | Obrenovac |
2011 | Mechanical erection of ESP B2-Rafako S.A. | Obrenovac |
2011 | Overhaul of conveyors in B1 & B2 | Obrenovac |
2011 | Dismounting-erection on ESP at TENT B2 | Obrenovac |
2011 | Regular & emergency maintenance in TENT-B | Obrenovac |
2010 | Replacement of pipeline HDPE L-2 around trough II in ash depot | Obrenovac |
2010 | Works on ESP reconstruction at Unit A6 | Obrenovac |
2010 | Manufacture & erection of compensating rings within overhaul of Unit A-6 | Obrenovac |
2010 | Dismounting & erection of ESP floor on Unit A6 | Obrenovac |
2010 | Mechanical erection of ESP at Unit A6 | Obrenovac |
2009 | A6 Boiler overhaul | Obrenovac |
2009 | Mechanical maintenance (coal trans., rec. channels, slurry channels) | Obrenovac |
2008 | Vreoci Erection of 5 drive stations | Obrenovac |
2008 | A5 ESP equipment reconstruction at TENT | Obrenovac |
2008 | Mechanical erection of ash handling system at TENT B | Obrenovac |
2008 | Mechanical maintenance of coal feeders, ducts, air ducts, mill plants, scrapers | Obrenovac |
2007 | TENT- Unit A4 – Dismounting of the existing el. filter: steel structure, equipment and bearing steel structure, erection of new structure and equipment | Obrenovac |
2007 | Unit A4 –overhaul of accessory boiler plants | Obrenovac |
2006 | Unit A1 - erection of new structure and equipment, erection RAFAKO made equipment as per special contract, delivery and erection of thermal insulation, for modificaiton and repair of eletric filter | Obrenovac |
2005 | Boiler lining at TENT Unit A2 | Obrenovac |
2005 | Mechanical works at TENT Unit B5 | Obrenovac |
2005 | Dismounting of old and erection of new electric filter A2 | Obrenovac |
2005 | Capital overhaul and rehabilitation at TENT Unit A5 | Obrenovac |
Goša Montaža operates through an Integrated Management System consisting of ISO 9001 Quality Management System, ISO 14001 Environmental Management System and ISO 45001 Occupational Health and Safety Management System.
The complete process from design to erection is in accordance with EN 1090-2, and welding works are according to EN ISO 3834-2.